AWWA C623-22 Cured-In-Place Pipe (CIPP) Rehabilitation of Pressurized Potable Water Pipelines, 4 In. (100 mm) and Larger
Product Detail
Back to AWWA C623-22 Cured-In-Place Pipe (CIPP) Rehabilitation of Pressurized Potable Water Pipelines, 4 In. (100 mm) and Larger
AWWA C623-22 Cured-In-Place Pipe (CIPP) Rehabilitation of Pressurized Potable Water Pipelines, 4 In. (100 mm) and Larger

AWWA C623-22 Cured-In-Place Pipe (CIPP) Rehabilitation of Pressurized Potable Water Pipelines, 4 In. (100 mm) and Larger

https://www.awwa.org/Portals/0/files/publications/images/Look%20Inside.JPG  Look Inside

This standard covers materials and procedures for the rehabilitation of existing water mains 4 in. (100 mm) in diameter and larger by the installation and curing of a resin impregnated textile tube that is either inverted into the main using a hydrostatic head of potable water or air pressure or pulled into the main and subsequently inflated by potable water or air. The CIPP is cured by circulating hot water, introducing controlled steam or photoinitiated reaction (light) within the resin impregnated textile tube once installed into the existing pipe. When cured the finished product will be a continuous, tight fitting cured-in-place pipe (CIPP).

  • List Price: $92.00
  • Member Price: $64.00
 
Want to save more?
Log into see if you qualify for a lower rate.
Members save $28.00 or more Join
Item Details:

The purpose of this standard is to provide the minimum requirements for the materials and installation of CIPP systems for the rehabilitation of existing potable water mains 4 in. (100 mm) in diameter and larger. The standard includes materials, inspection and preparation of mains for CIPP...

Back to AWWA C623-22 Cured-In-Place Pipe (CIPP) Rehabilitation of Pressurized Potable Water Pipelines, 4 In. (100 mm) and Larger
View More View Less

YOU MIGHT ALSO LIKE...

PEOPLE WHO BOUGHT THIS ALSO BOUGHT...

 

0